Traffic Management Plan Revision Control Register Dubai

Traffic-management plans often change as project phases, access arrangements and work limits evolve. A revision-control register helps the site team know which plan is current and prevents superseded layouts from remaining in active use.

HMJ Contracting prepares and supports traffic management plans in Dubai for road works, construction and temporary traffic arrangements.

1. Record Every Revision

List the plan number, revision, issue date and prepared-by reference.

2. State the Reason for Change

Typical reasons include:

  • New work phase
  • Changed lane closure
  • Revised access point
  • Utility conflict
  • Updated diversion route
  • Site-condition change

3. Track Review Status

Record whether the revision is draft, under review, approved or superseded.

4. Identify Affected Sheets

For multi-sheet packages, note exactly which drawings changed.

5. Remove Superseded Plans

Old plans should be removed from active site folders and clearly archived.

6. Control Site Distribution

Record who receives the latest approved revision.

7. Link to Permit or Approval References

Where relevant, add the associated NOC, permit or approval reference.

8. Brief the Site Team

Any significant revision should be explained before implementation.

9. Keep a Change History

Do not overwrite previous revisions; keep the full sequence for traceability.

10. Verify Before Mobilisation

Before each new phase, confirm the site team is working from the latest approved arrangement.

A controlled revision register reduces drawing confusion and improves consistency between planning and site implementation.