A contract may identify the project by plot number, while a maintenance order uses a building name and the supplier knows only the street address. These references can all be valid and still point reviewers to different edges of a site. The application brief needs one unambiguous description of the proposed work location.
Build a location cross-reference
Record the plot reference exactly as supplied, the building name, the street used for access and the frontage actually affected. Against each field, note the document or person that supplied it. Mark the work area separately from the building entrance. An address identifies a destination; it does not show which public space the project proposes to use.
A corner plot with two addresses
Suppose the contract names Street A while a contractor plans to unload along Street B. Before choosing a map point, ask the project representative to confirm which frontage carries the work and the drawing coordinator to reconcile it with the current site layout. Do not silently replace one address with the other or describe both streets as affected if only one is in scope.
Use the same wording throughout
Once confirmed, carry the resolved description into the application narrative, drawing title and contractor brief. Keep any familiar alternative building name as a cross-reference. If the discrepancy remains unresolved, assign an owner and keep the drawing provisional so an unverified location does not reach a driver or applicant as a confirmed instruction.
Related guide: RTA ROWPS Application Service: Defining Support Scope and Client Handover. For the authority’s application route, see the Dubai RTA right-of-way permit service.
Contact us today and let us handle your RTA ROWPS application.

