An enquiry for an RTA Right of Way Permit for Festival Decoration Installation should explain what the installation occupies, not just name the festival. A decoration may stand inside a venue while its delivery or access equipment uses a public frontage. Another project may remain entirely within private space. Identify the actual interface before choosing the application route.

What to send for an initial review

Prepare the site location, proposed installation and removal dates, contractor activity description and a drawing showing the affected areas. Ask the venue to identify its boundary and access arrangements. Record any proposed storage between visits. If a specialist drawing is still provisional, label it clearly and give the coordinator its owner.

ROWPS for Festival Decoration Installation

Use this phrase to describe the proposed project when seeking help, rather than assuming a dedicated permit category exists for every decoration job. The applicant should check the current official service, scope and authority requirements for the location. The event organiser and installation contractor should also confirm what other permissions their activities require.

When the enquiry includes a road closure

For RTA Road closure for Festival Decoration Installation, identify the street section, affected access and full proposed work window, including setup and removal. Distinguish the desired arrangement from one that has been approved. The responsible team must confirm the relevant permit route and conditions; a submitted drawing or supplier booking is not a decision.

Keep the outcome traceable

Record which dates, stages and drawing revision were submitted, who monitors correspondence and which documents are issued. Before booking mobilisation, reconcile the planned work with the actual outcome. If removal is on another date, check that date explicitly instead of assuming it follows automatically from the installation approval.

Related HMJ guide: Right of Way Permit Dubai. Check the official Dubai RTA right-of-way utilisation service for application information.

Send your location, work description and proposed dates to HMJ for a scope review, or call +971 50 778 9046.

Check the Periods Between Installation and Removal

Describe materials retained between work visits and return packaging and collection access separately. These stages can occupy a different area or use a different date from installation. Give the applicant the full proposed sequence so the relevant permission scope can be confirmed.