Traffic Management for a decoration or advertising-sign project depends on clear communication between the client, installer, applicant and site team. If the project coordinator changes before mobilisation, the replacement needs more than the latest drawing attachment. Prepare a short handover that identifies what is confirmed and what remains unresolved.

Transfer decisions with their supporting records

List the working location, planned dates, current drawing revision and responsible contacts. Link each confirmed arrangement to its supporting record. Keep draft proposals and issued documents clearly distinguished. A message saying the project is ready may refer only to fabrication, not to the public-space arrangements.

Identify outstanding actions by owner

Record who must confirm equipment dimensions, answer review comments, approve supplier timing or provide property access information. Assign each action to a named role and indicate the next decision needed. This prevents the replacement coordinator from assuming that a task was completed merely because it appeared in an earlier email.

Update the dispatch contact list

Tell the installer and delivery dispatcher who can confirm readiness. Agree how urgent changes reach the applicant and traffic team. The coordinator handover does not transfer account permissions automatically; any access to authority systems must remain authorised through the applicable arrangements.

Example: two people hold different drawings

The outgoing coordinator has a revised equipment location, while the replacement receives an older supplier brief. Reconcile the documents before issuing instructions. Confirm which arrangement corresponds to the relevant issued permission and resolve discrepancies before the team mobilises.

When comparing Traffic Diversion Services, ask how the supplier manages document ownership and staff changes. Our Best Traffic Management Company selection guide provides evidence-based questions, and the RTA ROWPS support scope guide helps define responsibilities. These are practical selection criteria, not a ranking claim.

Check the official RTA right-of-way utilisation service for current Dubai application information. Send HMJ your project brief or call +971 50 778 9046.