Overweight and Overdimension Vehicle Permit Dubai – RTA Abnormal Load Approval

Transporting overweight or overdimension vehicles and loads on Dubai’s public roads requires a specific RTA permit. Loads that exceed standard weight limits or physical dimensions — height, width, or length — cannot travel on public roads without route approval, timing restrictions, and in many cases escort arrangements. HMJ Contracting manages overweight and overdimension vehicle permit applications in Dubai. Call +971 50 778 9046.

What Qualifies as Overweight or Overdimension?

Overweight Vehicles

Any vehicle or vehicle-and-load combination that exceeds the maximum gross vehicle weight permitted on public roads in Dubai. This includes loaded low-loaders carrying heavy plant, multi-axle trailers carrying industrial equipment, and any transport where the total weight exceeds the road’s structural design capacity.

Overdimension Vehicles

Any vehicle or load that exceeds standard maximum dimensions for width, height, or length. Common examples include wide loads such as prefabricated building modules, tall loads exceeding bridge clearance heights, and long loads such as structural steel beams, wind turbine blades, or large industrial vessels.

RTA Requirements for Abnormal Load Transport

  • Detailed vehicle and load specification — dimensions, weight, axle configuration
  • Proposed route assessed for bridge clearances, road widths, turning radii, and weight restrictions
  • Proposed travel date and time — typically restricted to night hours on low-traffic periods
  • Escort vehicle requirements — pilot cars ahead and behind the load with warning signs and beacons
  • Police escort coordination for loads above specified thresholds
  • Temporary traffic management where the load requires lane occupation — TMA escort vehicles may be required
  • Temporary removal of street furniture, signs, or traffic signals along the route if necessary

How HMJ Supports Abnormal Load Transport

HMJ manages the full permit application, coordinates escort arrangements, and provides any required traffic management support along the route — including TMA shadow vehicles for slow-moving loads, advance warning signage, and temporary lane closures at critical points. See also our heavy construction vehicle permit page and banned times permit page.

Get Your Overweight or Overdimension Vehicle Permit

Call +971 50 778 9046. Early engagement is essential — complex abnormal load movements can require several weeks of route assessment and permit processing.

Share This Story, Choose Your Platform!

Leave A Comment