A sign schedule links each traffic sign to a specific location, message and support type. Verifying the schedule against the site helps prevent missing, duplicated or incorrectly oriented signs.
HMJ Contracting supplies road traffic signs and safety equipment in Dubai.
1. Assign a Sign Reference
Give every sign a unique reference that matches the drawing or schedule.
2. Record the Intended Location
Use road name, chainage, junction or work-zone section.
3. Confirm the Sign Message
Check that the installed sign matches the scheduled message and symbol.
4. Verify Orientation
The sign face should be directed toward the intended traffic approach.
5. Check Support Type
Record whether the sign uses a temporary stand, post, frame or other support.
6. Review Visibility
Look for obstructions from barriers, vehicles, vegetation or other signs.
7. Track Installation Status
Use statuses such as:
- Not installed
- Installed
- Requires adjustment
- Replaced
- Removed
8. Add Photographs
Photographs help confirm exact location and condition.
9. Review After Layout Changes
Update the schedule if the traffic arrangement changes.
10. Complete a Final Site Verification
Walk or drive the route and confirm the schedule matches the physical installation.
A verified sign schedule improves site control and makes future maintenance or replacement easier to manage.