RTA NOC Drawing Transmittal Register Dubai
A drawing transmittal register helps project teams control exactly which RTA NOC drawings have been issued, revised and resubmitted. Without a clear register, teams can accidentally circulate superseded drawings or lose track of what was actually submitted.
HMJ Contracting supports RTA NOC applications in Dubai, drawing preparation, document control and approval follow-up.
1. Record Every Drawing
The register should include:
- Drawing number
- Drawing title
- Revision
- Issue date
- Prepared by
- Checked by
2. Identify the Submission Purpose
Mark whether the issue is:
- Initial submission
- Response to comments
- Revised submission
- Final approved issue
3. Track Recipients
Record who received each issue, including consultants, client teams and submission coordinators.
4. Link Comments to Revisions
Where a drawing changes because of a review comment, reference the relevant comment or response item.
5. Separate Current and Superseded Drawings
Keep the latest active revision clearly visible and archive older revisions separately.
6. Confirm File Names
The filename should match the drawing number and revision so uploaded files are easy to verify.
7. Review Before Resubmission
Before submitting a revised package, confirm:
- all drawing revisions are current,
- references match the document index,
- superseded drawings have been removed,
- response comments point to the correct revision.
A controlled transmittal register reduces confusion and strengthens the overall NOC submission process.