Traffic Management Plan Field Change Authorization Log Dubai
A live work zone can require a field change because of access conflicts, site conditions, construction sequencing or traffic behaviour. Any change should be controlled so the site team does not drift away from the approved traffic-management arrangement.
HMJ Contracting prepares and supports traffic management plans in Dubai.
1. Describe the Requested Change
Record exactly what the team wants to change on site.
2. State the Reason
Typical reasons may include access conflict, blocked equipment position, site obstruction or changed work sequence.
3. Identify the Affected Layout
Note which lane, sign, barrier, taper, access point or pedestrian route is affected.
4. Check the Current Plan
Compare the requested field change with the active drawing revision.
5. Assign Review
The responsible supervisor or project engineer should review the change before implementation.
6. Record Approval Status
Use a simple status such as:
- Not approved
- Approved for temporary use
- Requires drawing revision
- Cancelled
7. Record Implementation Time
If approved, note when the change becomes live.
8. Brief the Site Team
Make sure operators, marshals and supervisors understand the revised arrangement.
9. Verify the Site
Complete a quick walkthrough after implementation.
10. Close or Formalise the Change
Temporary changes should either be reversed or incorporated into the controlled plan where required.
A field-change log improves traceability and reduces informal site alterations.
For traffic-management drawings and implementation support in Dubai, contact HMJ Contracting.


