Traffic Management Plan Site Kickoff Checklist Dubai
Before the first traffic-management setup goes live, the project team should hold a short site kickoff so everyone understands the latest drawing, work limits, access arrangements and responsibilities.
HMJ Contracting prepares and supports traffic management plans in Dubai.
1. Confirm the Latest Drawing
Make sure all supervisors are working from the current approved or project-controlled revision.
2. Review the Work Limits
Show the team exactly where the activity starts and ends.
3. Assign Key Roles
Confirm the traffic-management supervisor, TMA operator, marshals and access-control contacts.
4. Review Access Points
Identify crew, delivery and emergency access routes.
5. Confirm Sign and Barrier Setup
Check the installation sequence and equipment schedule.
6. Review TMA Position
Make sure the operator understands the planned position and work activity.
7. Check Pedestrian Routes
Review any temporary walkway or crossing affected by the works.
8. Confirm Emergency Arrangements
Make sure emergency access and escalation contacts are clear.
9. Set Communication Methods
Confirm radio channels or backup contact methods.
10. Complete a First-Day Walkthrough
After setup, walk the site against the plan and record any correction needed.
A focused kickoff helps align the drawing, site team and physical setup before work begins.
For traffic-management plans and implementation support in Dubai, contact HMJ Contracting.


