Right of Way Permit Site Mobilisation Checklist Dubai

Mobilising inside or beside the public Right of Way should start only after the project team confirms that the approved limits, documents, access arrangements and traffic controls match the work that will actually happen on site.

HMJ Contracting supports Right of Way permit applications in Dubai with drawings, documentation and ROWPS coordination. Call +971 50 778 9046.

1. Confirm the Approved Work Limits

Mark the permitted work area and make sure supervisors understand where work may and may not take place.

2. Verify the Latest Drawings

Issue only the latest approved drawings to the site team. Remove superseded revisions from active folders and mobile devices.

3. Review Site Access

Confirm vehicle entry, pedestrian movement, delivery routes and any temporary access controls before mobilisation begins.

4. Check Utility Information

Review available utility information and any related coordination requirements before excavation, drilling or temporary works.

5. Confirm Traffic-Management Requirements

Where the works affect traffic, verify that the required signs, barriers, TMA vehicles, cones and other controls match the approved arrangement.

6. Brief the Site Team

The mobilisation briefing should cover permit limits, approved dates, emergency contacts, traffic interfaces, public protection and reporting responsibilities.

7. Prepare Inspection Records

Create a simple pre-start record with photographs showing the existing site condition, access points and public interfaces.

Mobilisation Checklist

  • Permit reference confirmed.
  • Work limits marked.
  • Latest drawings issued.
  • Access plan confirmed.
  • Utility information reviewed.
  • Traffic controls available.
  • Site team briefed.
  • Pre-start photographs completed.

For Right of Way permit and ROWPS support in Dubai, contact HMJ Contracting at +971 50 778 9046.