Right of Way Inspection Request Preparation Dubai

Before requesting an inspection for work inside the Right of Way, the project team should make sure the site condition and records are ready for review.

HMJ Contracting supports Right of Way permits in Dubai.

1. Confirm the Work Is Ready

Verify that the relevant activity is complete and that unfinished work will not prevent inspection.

2. Check Approved Limits

Compare the actual work area against the approved permit and drawings.

3. Review Reinstatement

Inspect repaired surfaces, kerbs, pavements, verges and affected public areas.

4. Gather Permit References

Keep the permit number, approved drawings and related correspondence available.

5. Prepare Photographs

Capture clear images of:

  • completed work,
  • reinstated surfaces,
  • access points,
  • affected utilities or crossings,
  • final site condition.

6. Resolve Visible Defects

Correct obvious defects before requesting inspection where practical.

7. Confirm Site Access

Make sure the inspector can safely access the relevant areas.

8. Keep a Site Representative Available

A knowledgeable supervisor should be ready to explain the work and provide project records.

A structured inspection-readiness check helps avoid unnecessary repeat visits and closeout delays.

For ROW drawings, permit documentation and inspection preparation, HMJ Contracting supports contractors across Dubai.

Share This Story, Choose Your Platform!

Leave A Comment