ROWPS Work Limit Boundary Marking Checklist Dubai
Clear work-limit marking helps the site team understand exactly where activity is permitted under a ROWPS permit. Before mobilisation, the approved limits should be translated from the drawing into visible site references.
HMJ Contracting supports ROWPS applications in Dubai with Right of Way drawings, documents and permit coordination.
1. Review the Approved Drawing
Confirm the latest approved plan and identify the exact work boundaries.
2. Mark Start and End Points
Use clear site references for the limits of excavation, installation or temporary occupation.
3. Identify Access Points
Mark the approved entry and exit locations for workers, plant and deliveries.
4. Check Utilities
Make sure boundary markings do not conflict with known utility locations or access chambers.
5. Protect Public Interfaces
Where work limits meet footpaths, roads or property access, add clear separation and warning controls.
6. Photograph the Marked Limits
Keep photographs showing the work area before activity begins.
7. Brief the Site Team
Supervisors and operators should understand where work is permitted and which areas are outside the approved scope.
8. Recheck After Layout Changes
If barriers, fencing or access points move, verify that the marked limits still match the approved arrangement.
9. Record Daily Verification
For longer-duration works, include work-limit verification in the daily site check.
10. Keep the Marking Record With the Permit
Store drawings, photographs and site-marking notes with the active permit file.
A clear boundary-marking process reduces accidental work outside the approved ROWPS scope.