ROWPS Work Limit Boundary Marking Checklist Dubai

Clear work-limit marking helps the site team understand exactly where activity is permitted under a ROWPS permit. Before mobilisation, the approved limits should be translated from the drawing into visible site references.

HMJ Contracting supports ROWPS applications in Dubai with Right of Way drawings, documents and permit coordination.

1. Review the Approved Drawing

Confirm the latest approved plan and identify the exact work boundaries.

2. Mark Start and End Points

Use clear site references for the limits of excavation, installation or temporary occupation.

3. Identify Access Points

Mark the approved entry and exit locations for workers, plant and deliveries.

4. Check Utilities

Make sure boundary markings do not conflict with known utility locations or access chambers.

5. Protect Public Interfaces

Where work limits meet footpaths, roads or property access, add clear separation and warning controls.

6. Photograph the Marked Limits

Keep photographs showing the work area before activity begins.

7. Brief the Site Team

Supervisors and operators should understand where work is permitted and which areas are outside the approved scope.

8. Recheck After Layout Changes

If barriers, fencing or access points move, verify that the marked limits still match the approved arrangement.

9. Record Daily Verification

For longer-duration works, include work-limit verification in the daily site check.

10. Keep the Marking Record With the Permit

Store drawings, photographs and site-marking notes with the active permit file.

A clear boundary-marking process reduces accidental work outside the approved ROWPS scope.