Right of Way Daily Permit Compliance Log Dubai
Work inside or affecting a public Right of Way should remain aligned with the approved permit throughout the project, not only on the first day. A simple daily compliance log helps supervisors record whether the site still matches the approved work limits, access and safety arrangements.
HMJ Contracting supports Right of Way permits, RTA drawings and ROWPS coordination in Dubai. Call +971 50 778 9046.
Confirm the Approved Work Limits
Check that excavation, equipment, materials and temporary works remain inside the approved area. Any movement beyond the permitted limits should be escalated before work continues.
Verify Access and Egress
Record whether construction access points, delivery routes and pedestrian interfaces remain as approved. Site changes can create conflicts even when the original drawing was correct.
Check Traffic Controls
Where the permit includes traffic management measures, confirm signs, barriers, cones and any protective vehicles remain correctly positioned and visible.
Record Utility and Surface Conditions
Note any exposed utilities, unexpected services, damaged pavement or changes to the existing site condition that could affect the permitted work.
Monitor Reinstatement
Where sections are completed, record temporary or permanent reinstatement status and any outstanding repairs.
Note Changes and Corrective Actions
If the site differs from the approved arrangement, record the issue, responsible person and corrective action. Significant changes may require revised drawings or permit coordination.
Keep the Log With Project Records
Daily records support supervision, closeout and future review of the permit conditions.