A delivery that requires reversing at a site entrance should be identified during planning, not discovered when the truck reaches the gate. The manoeuvre can affect a public road or footpath beyond the unloading position. For loading and unloading in Dubai, give the designer enough information to assess the whole arrival and departure sequence.
Describe the actual movement
Provide the proposed vehicle configuration, arrival direction, unloading location and intended exit. Mark where reversing is anticipated and which public routes may be affected. A general instruction to reverse into the site does not explain the space needed or the conflicts to resolve. Use vehicle-specific information supplied by the transport provider.
Assess alternatives with the competent team
Ask whether a forward-entry and forward-exit arrangement is feasible within the available site. Other proposals may involve a different receiving location or delivery sequence. Each option needs assessment against the actual geometry, handling method and approvals. This article does not prescribe driving techniques or establish that any proposed manoeuvre is safe.
Identify public access conflicts
Show footpaths, entrances, parking movements and nearby junctions that interact with the proposal. Do not assume warning lights or a marshal alone resolve the conflict. The responsible team should determine the required controls through the applicable design and risk-review process. Where public traffic arrangements change, confirm the authority requirements before implementation.
Brief the delivery provider
Once the arrangement is confirmed, give the supplier the correct entrance, current access instructions and receiving contact. Establish how the driver obtains a readiness confirmation and what to do if the route is obstructed. Changes in vehicle type or approach direction should trigger review rather than an improvised manoeuvre at the gate.
Prepare the traffic coordination package
Send HMJ a site plan, recent photographs, vehicle details and the proposed movement sequence. Include existing approved drawings and any identified access issue. The brief should support coordination of traffic diversion and road occupation where applicable. Record changes after review and ensure the receiving team works from the same current information as the transport provider.
Related guidance and project support
Read our Traffic Diversion for Loading, Unloading & Concrete Casting Works Dubai. For the applicable Dubai service requirements, consult RTA’s official right-of-way occupation service. Approval scope depends on the location and activity.

